The development will consist of planning permission for 0.8MW kWp (kilowatt peak ) solar photovoltaic ( PV ) array designed to meet the operational needs of Boyne Valley Meats on a 1.26 hectare site. The proposed development also includes; (a) up to 3,820 sq. metres of solar photovoltaic panels on ground mounted steel frames, (b) electrical equipment pad, (c) underground power and communication cables and ducts, (d) boundary security fencing, (e) 5 metre buffer zone all round site perimeter, (f) temporary construction compound, (g) set-back of existing agricultural entrance for temporary access from L50461 public road (h) connection to existing sub-station previously granted permission under planning reference 23/1114. (i) all associated site works
To find out more details on this Power Generation Development in Meath Applied for on 7th May 2025 take the free trial here.

