Proposed replacement of existing turbine (permission ref: C/2008/0940/F) with the erection of a Vestas V44 wind turbine comprising of a 55m hub height and rotor diameter of 44m, associated underground cabling, area of hardstanding and site works, and retention of switch room and substation (includes removal of the existing wind turbine and area of existing hardstanding).
To find out more details on this Power Generation Development in Derry & Strabane Applied for on 8th January 2025 take the free trial here.

