Erection of replacement wind turbine with a maximum hub height of 40m and maximum blade length of 26m to replace existing wind turbine approved and built under C/2011/0626/F (2012/A0304), associated 2 no. electricity cabinets and site works.
To find out more details on this Power Generation Development in Causeway Coast & Glens Granted permission on 31st January 2025 take the free trial here.

