Proposed replacement of existing turbine approved under G/2010/0432/F with a Vestas V44 turbine comprising of a 40m hub and 22m blade span (overall tip height of 62m).
To find out more details on this Power Generation Development in Mid & East Antrim Granted permission on 18th April 2025 take the free trial here.

