Proposed Single 150KW wind turbine (31.2 m high to centre of hub and 24m rotor diameter) with associated ancillary development including construction of section of laneway and crane hardstanding, on site switch control building and all other ancillary and associated works.

To find out more details on this Power Generation Development in Armagh Banbridge & Craigavon Applied for on 19th December 2023 take the free trial here.


Address:
Approximately 360m Nw of 15 Listrakelt Road

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL