Planning permission for the installation of three no. 20 kw wind turbines within the grounds of the existing connacht gaa centre of excellence previously permitted and constructed under pl. Ref p08/1995. The three turbines will have a tower height of 18m, a blade diameter of 9. 8m and a blade tip height of 24m. The installation of the three no. Wind turbines will be adjacent to the existing 3g pitch and will include all associated site development works within the grounds of the existing Connacht GAA Centre of Excellence
To find out more details on this Power Generation Development in Mayo Granted permission on 3rd September 2024 take the free trial here.