Erection of replacement wind turbine with a maximum hub height of 40m and a maximum blade length of 26m to replace existing wind turbine approved and built under M/2011/0464/F, associated 2 no. electricity cabinets and site works.

To find out more details on this Power Generation Development in Mid Ulster Applied for on 12th March 2024 take the free trial here.


Address:
Lands Approximately 320m South-East of No 47 Aghintober Road

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL