Erection of Vestas V44 (250 kW) wind turbine with a 50m hub height and 44m rotor diameter to replace existing operational wind turbine within the site.
To find out more details on this Power Generation Development in Derry & Strabane Applied for on 17th May 2024 take the free trial here.