Erection of Vestas V44 (250 kW) wind turbine with a 50m hub height and 44m rotor diameter to replace existing operational wind turbine within the site.

To find out more details on this Power Generation Development in Derry & Strabane Applied for on 17th May 2024 take the free trial here.


Address:
Approximately 323m South East of 16 Keenaghan Road

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL