Proposed 300kw wind turbine (40m tower and 33m blade DIA) for connection to the grid.
To find out more details on this Power Generation Development in Derry & Strabane Applied for on 12th November 2024 take the free trial here.
Proposed 300kw wind turbine (40m tower and 33m blade DIA) for connection to the grid.
To find out more details on this Power Generation Development in Derry & Strabane Applied for on 12th November 2024 take the free trial here.