Erection of new proposed 40m hub height and 44m rotor diameter wind turbine (up to 250kW output) to substitute existing 31m hub height and 30m rotor diameter wind turbine approved under J/2012/0071/F.

To find out more details on this Power Generation Development in Derry & Strabane Granted permission on 20th January 2025 take the free trial here.


Address:
290m South West of 195 Melmount Road

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL