Category

Industry News

Industrial Construction – West Pharmaceuticals Products Ireland Ltd

By | Industry News

€36m Industrial Construction Commencement Lodged

Knockhouse Lower
Knockhouse
Co. Waterford

Floor Area: 26,484 SqM

Stage: Commencement

Value: €36 Million

To construct a new 26,484 sq m manufacturing facility comprising a single building having a maximum parapet height of 13.2m and a maximum overall height of 16.5 m above ground level, incorporating a two storey 8,315sq m manufacturing and warehouse block with an intermediate mezzanine floor, a rooftop penthouse plantroom and open plant area, a two storey 8,357 sq m finishing and warehousing block with an intermediate mezzanine floor, a rooftop penthouse plant room and open plant area, a three storey 2,349 sq m technical support and central utility block with a rooftop penthouse plantroom and open plant area having a maximum boiler stack height of 18.5 m above ground level, a three storey 7,242 sq m central administration and technical services block with a rooftop penthouse plantroom and open plant area, a single storey 24 sq m goods entrance security building, a single storey 16 sq m car park gate house, a single storey 66 sq m materials storage building, a single storey 54 sq m pump…

Industrial Construction West Pharma

 

Applicant
West Pharmaceuticals Products Ireland Ltd
Knockhouse Lower
Knockhouse
Co. Waterford

Architect
Ove Arup & Partners Ltd
15 Oliver Plunkett Street
Cork
021 4277670
cork@arup.com
www.arup.com

Main Contractor
John Sisk & Son Ltd. (Head Office)
Wilton Works
Naas Road, Clondalkin
Dublin 22
01 4091500
info@sisk.ie
www.sisk.ie

Consultant
Brady Shipman Martin
Block 6 Belfield Office Park
Clonskeagh
Dublin 14
01 208 1900
mail@bradyshipmanmartin.com
www.bradyshipmanmartin.com

Consultant
Dixon Brosnan
7 The Cedars
Bridewood
Ovens, Co. Cork
086 851 1437
damian@dixonbrosnan.com
www.dixonbrosnan.com

Residential Construction feature on Tv3 – Interview with Danny O’Shea

By | Industry News

Danny O’Shea Discusses Residential Construction

In this short video, Link2Plans/BuildingInfo CEO, Danny O’Shea discusses the findings from the latest National Housing Construction Index on TV3 News.  The news report focusses on the state of the Residential Construction market in terms of planning and commencement activity which notes the impact of last years change in Building Regulations and the knock on effect this has had on Residential Construction commencements during the early part of this year.  Vol. 20 of the National Housing Construction Index follows the recently published Building Information Index which analyses larger Residential Construction projects as well as other Commercial Construction sectors.

 

Residential Construction – €4.7m Residential Development in Co. Dublin

By | Industry News

Residential Construction Project in Rathcoole

Rathcoole
Co. Dublin

Stage: Commencement

Start Date: 9th July 2015

Units: 27

Construction of 27 dwellings which have been divided into four blocks; Block 1 consists of 5 three bedroom dwelling houses and 4 four bedroom dwelling houses; Block 2 consists of 1 four bedroom dwelling house and 1 three bedroom dwelling house; Block 3 consists of 7 three bedroom dwellings and 6 four bedroom dwellings; Block 4 consists of 3 one bedroom dwellings; construction of access road including the provision of footpaths, grass verges and car parking amenities and for all associated works; construction of a foul sewer network to serve the proposed development which shall connect into existing foul sewer network; construction of a surface water sewer network to serve the proposed development including the provision of the necessary attenuation elements and for the connection of the surface water network to the existing surface water network; provision of a watermain to serve the proposed development; provision of public open space amenities including landscaping; construction of relevant boundary walls and fences and for the construction of piers and boundary walls at the access point to the proposed development; public signage throughout the development and all ancillary site works.

Pavement Residential Construction

Architect
William Donoghue & Associates Ltd.
Woodlands
Rathangan
074 9735892 | william@donoghuearchitects.ie | www.donoghuearchitects.ie

Applicant
Pavement Investments Ltd.
Unit 13 Block G
Greenogue Industrial Estate
Rathcoole
Co. Dublin

Architect
Thor Design & Management
Ballindarra
Birr
057 9121688 | www.thordesign.ie

Residential Construction – €530k Residential Development in Co. Wicklow

By | Industry News

2 Unit Residential Construction Project

Knockroe
Delgany
Co. Wicklow

Stage: Commencement

Start Date: 7th July 2015

Units: 2

The demolition of an existing detached cottage and shed and the construction of 2 no. detached dormer private dwellings with all ancillary works within a 0.3 acre site.

T Peare residential construction

Applicant / Contractor
T Peare & Sons Ltd.
Unit 21 Bulford Business Park
Kilcoole
Co. Wicklow
01 2874706 | info@peareconstruction.ie | www.peareconstruction.ie

Residential Construction – €13m Residential Development in Co. Kildare

By | Industry News

Capital Homes Residential Construction Project

Sallins Road
Naas
Co. Kildare

Stage: Commencement

Start Date: 11th June 2015

Units: 63

The development consists of : 63 two-storey houses made up of the following four house types: (a) 34 semi-detached. (b) 8 no detached dwellings (heron). (c) 11 no. detached dwellings (swan). (d) 10 no. detached dwellings (pheasant). (e) and all ancillary site works. A previous planning application was granted on the subject site (06/500044) with an extension of duration granted under 12/50006. This new application seeks to change the housing type from apartments granted under 06/500044 to a mix of semi-detached and detached dwelling units.

Capital Residential Construction

Architect
Clarke & Co Engineers
Highland View Terrace
Fairgreen
Naas
Co Kildare
045 866448 | info@clarkeng.ie | www.clarkeng.ie

Applicant
Capital Homes
Block 6 Central Business Park
Tullamore
Co Offaly
057 9328732 | info@capitalsecurities.ie

Engineer
Clarke & Co Engineers
Highland View Terrace
Fairgreen
Naas
Co Kildare
045 866448 | info@clarkeng.ie | www.clarkeng.ie

Contractor
Mythen Construction Ltd.
Longraigue
Foulksmills
051 565615 | info@mythenconstruction.ie | www.mythenconstruction.ie

Residential Construction – €14m Care Residential Development in Co. Kildare

By | Industry News

Glebe House Care Residential Construction Development

Crinnstown
Maynooth
Co. Kildare

Stage: Commencement

Start Date: 29th June 2015

Units: 79

Residential Construction Projects Medical Construction Projects

Is sought to amend the design granted under 09-1197, consisting of the following internal changes: increase number of residents from 67 residents to 79 residents allowing an additional 11 bedrooms, bringing the total to 78 with associated, en-suite, ancillary services, minor internal modifications, elevations changes to include an additional 3 window to North Elevation, 3 additional windows to south elevation, 3 windows to the West Elevation, the above amendments to be accommodated within the existing footprint granted under 09/1197 with no additional floor area.

Applicant
Glebe House Nursing Home
Fedamore
Co. Limerick
061 390127

Architect
Ballyvoughan Designs
Ardagh
Co. Limerick
087 2265721 | 069 76024 | gsballyv@eircom.net

Contractor
Ciaran Collins
Co. Cork

Residential Construction – €12m Residential Development in Co. Dublin

By | Industry News

Cosgrave Developments Residential Construction Project

Dun Laoghaire Golf Club Lands
Glenageary Road Upper Eglinton Park
Dun Laoghaire
Co. Dublin

Stage: Commencement

Start Date: 6th July 2015

Units: 46

Permission for revisions to the development permitted under Register Reference D09A/0908 (PL06D.237650). The revisions will comprise of revised house types and floor areas and revised associated road and parking layout within the permitted Housing Cells C1 (part), C2 (part) and C3 (part). The revisions proposed will replace 44 no. permitted dwellings (20 no. 4 bed two and a half storey and 24 no. 5 bed three storey) with 46 no. dwellings (39 no. 4/5 bed three storey and 7 no. 5/6 bed

Cosgrave Residential Construction

Architect
RPS Planning and Environment
Westpier Business Campus
Dun Laoghaire
Co. Dublin
01 4882900 | www.rpsgroup.com

Applicant
Cosgrave Developments
15 Hogan Place
Grand Canal Street
Dublin 2
01 6110417 | info@cosgravegroup.com | www.cosgravegroup.com

Consultant Engineer
Waterman Moylan
Marine House
Clanwilliam Place
Dublin 2
01 6648900 | info@waterman-moylan.ie | www.watermangroup.com

Contractor
Cosgrave Developments
15 Hogan Place
Grand Canal Street
Dublin 2
01 6110417 | info@cosgravegroup.com |www.cosgravegroup.com

Architect
McCrossan O’Rourke Manning Architects
4 Adelaide Court
Adelaide Road
Dublin 2
01 478 8700 | arch@mcorm.com | www.mcorm.com

Architect
MCORM Architects
Albert Place West
Harcourt Lane
Dublin 2
01 4788 700 | arch@mcorm.com | www.mcorm.com

National Housing Construction Index Vol. 20 – Jan to Apr 2015

By | Industry News

Activity in residential construction sector falls sharply compared to 2014 but sentiment remains positive – Link2Plans

Download Here Free – NHCI Vol. 20

Figures from the National Housing Construction Index for the first four months of 2015 show a sharp fall in activity in the Irish residential construction sector when compared to 2014 but sentiment continues to remain positive. The latest edition of the National Housing Construction Index from Link2Plans reveals that commencements have fallen by -51% in the first four months of 2015 when compared to the same period in 2014, while planning applications have risen by +18% nationally year on year.

The data contained in the National Housing Construction Index is aggregated by consultancy Link2Plans from real time planning and project information in every local authority area, with the latest edition of the National Housing Construction Index tracking every project from January through to April 2015, and comparing it with the same period in 2014.

Residential Construction Applications

Average number of weeks from planning application to commencement

Danny O’Shea Managing Director of Link2Plans said “Research from Link2Plans shows that from a national perspective, 142 weeks was the average period of time it took for residential developments to get from the planning application stage to commencement of work on site. For one off houses, our research shows that in the first four months of 2015, the process from planning application to starting work took 61 weeks.”

According to Danny O’Shea Managing Director of Link2Plans “Nationally, commencements were down -51% when compared to the first four months of 2014, with every county recording a fall. This continues the trend from the beginning of 2015 with commencements falling dramatically. Project applications however maintained strong double digit growth in 23 counties when compared to the first four months of 2014.”

Residential Construction Commencements

“Link2Plans considers the first half of 2014 to be very much an outlier in terms of construction activity on account of the structural changes in the market, which saw the introduction of new buildings regulations on 1st March 2014. These one off changes in the sector created a major injection in construction activity for that period. When compared to previous years’ such as 2013, we do see growth in the construction sector, with the first four months of 2015 showing an increase of +11% when compared to the same period in 2013. When these figures are combined with the strong growth in planning applications, which have recorded increases for the past 18 months, the forecast for medium term remains positive.” continued Danny O’Shea Managing Director of Link2Plans.

Danny O’Shea Managing Director of Link2Plans said that “across the country, in the first four months of 2015 the number of residential project commencements fell by 1744 from 3472 to 1698 when compared with the same period in 2014, with the smallest year on year decreases taking place in Waterford (-13%), Dublin (-22%), Cavan (-34%), Carlow (-36%) and Wicklow (-37%).”

Applications up +18% nationally as Leitrim, Louth and Laois record biggest gains

Leitrim, Louth and Laois were the best performing counties for the first four months of 2015 when compared to 2014, recording growth of +64%, +61% and +51% respectively. Cavan (+52%), Sligo (+51%), Kerry (+51%) and Meath (+48%) also returned significant increases while, planning applications were down in only two counties, Limerick (-3%) and Dublin (-1%).

Danny O’Shea Managing Director of Link2Plans said “the number of planning applications in the first four months of 2015 increased by 713 from 3889 to 4602, representing an increase of +18% nationally year on year. This is evidence of the positive sentiment in the residential construction sector, with nearly every county in country seeing an increase in the number of planning applications when compared to the same period in 2014.”

The National Housing Construction Index is produced by a team of researchers at Link2Plans and it relates to all Planning Applications and Project Commencements throughout the months of January to April 2015 and gives a direct comparison with the same period in 2011, 2012, 2013 and 2014.

Link2Plans have produced this index bi-monthly and it has been the most accurate barometer of real time sentiment (planning applications) and actual residential construction activity (project commencements) including residential developments (multi units), one-off housing (self-build) and one-off housing extensions.

School Construction – €4.1m Clifden Community School in Co. Galway

By | Industry News

School Construction Project in Clifden

Ardbear
Clifden
Co. Galway

Stage: Plans Applied

Application Date: 5th June 2015

Floor Area: 3852 SqM

School Construction: For demolition of the existing school building and associated pre-fabricated classroom structures and the construction of a new, part 2 storey and part 3 storey school building along with a new school entrance and associated internal access roads, parking spaces, landscaping and drainage works including an on site waste water treatment plant. Previous Planning Reference no.10/1022.

School Construction Projects

Architect
DeBlacam & Meagher Architects
4. St.Catherine’s Lane West
Dublin 8
01 453 4240
mail@debm.ie

Applicant
Clifden Community School
Ardbear
Clifden
Co.Galway

Medical Construction – €3.2m Suirmount Nursing Home Extension in Co. Tipperary

By | Industry News

Medical Construction Nursing Home Project in Co. Tipperary

Suirmount Nursing Home
Carrickbeg
Carrick-on-Suir
Co. Tipperary

Stage: Plan Granted

Granted Date: 10th June 2015

Units: 54

Medical Construction Planning Granted: Alter and extend which when complete will comprise of a fifty four bed nursing home with associated facilities in accordance with the HIQA standards for care homes and in accordance with drawings and specifications being lodged to the Local Authority.

Medical Construction Projects

Architect
Ahearne Engineering Ltd
4 Dr. Croke Place
Clonmel
Co. Tipperary
052 6121063
admin@afec.ie

Applicant
William Bradbury
Garoonagh
Barrow House
Athy
Co. Kildare

Engineer
Ahearne Engineering Ltd
4 Dr. Croke Place
Clonmel
Co. Tipperary
052 6121063
admin@afec.ie